10,000+ Mattresses Made Made to Your Exact Shape Free UK Delivery ★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:Imperial2000S109

Imperial Elite 2000 Right S Curve Bespoke Mattress - Single

Regular price ยฃ729.00
Regular price Sale price ยฃ729.00
Sale Sold out
Choose Mattress Firmness
Selected surface finish
Medium feel The Medium mattress has a smooth, flat sleeping surface — the cover has no buttons.
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit โ†’

Quick measuring reference

Place your order and send your measurements afterwards โ€” email us at hello@mybespokemattress.com or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit โ€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back โ€” we'll do the rest.

Sent once your mattress order is placed ยท Completely free ยท Posted out promptly

Quantity
Free UK delivery
England, Scotland & Wales
Made to your exact size
Cut to your measurements
Handmade in Britain
In our workshop since 1985
Guaranteed quality
Up to 10-year guarantee
View full details
Imperial Eliteโ„ข 2000 Custom Mattress lifestyle Seven Layer Construction
Imperial Eliteโ„ข 2000 construction cutaway Lifestyle

Genuine high-end bedroom comfort in a custom size cut for your exact bed โ€” 2000 pocket springs beneath layers of memory foam, cool gel and a cashmere-blend cover.

  • 2000 individually wrapped pocket springs
  • 3 firmness levels: Medium, Firm, Hard
  • One depth: 25 cm
  • 10-year guarantee
  • Soft cashmere-blend cover
  • A layer that carries the heat away โ€” 30ร— more breathable than memory foam (Revoยฎ)
  • Memory foam that moulds to you (Vascoยฎ60)
  • A firm edge you can sit on and push up from

Your Surface: Smooth or Dimpled?

Every Imperial Elite™ 2000 is tufted — the buttoning that sets the spring tension and locks the fillings in place. How we tuft depends on the firmness you choose, and it changes how the top of the mattress looks and feels:

Smooth half-tufted pocket spring mattress surface - the Medium Imperial Elite 2000
Medium — Half-Tufted (Smooth) A smooth, even sleeping surface. Half-tufting sets a medium tension while keeping the top flat.
Full-tufted dimpled pocket spring mattress surface - the Firm and Hard Imperial Elite 2000
Firm & Hard — Fully Tufted (Dimpled) The traditional dimpled, buttoned surface. Full tufting draws the buttons right through the mattress for a firmer feel.

Seven Layer Construction

Imperial Eliteโ„ข 2000 seven-layer construction diagram
  1. Soft cashmere-blend cover

    Remarkably soft to the touch and naturally hypoallergenic, with a smooth finish that holds its shape season after season.

  2. Cool-gel layer that carries the heat away (Revoยฎ)

    This open-celled foam layer draws heat away from you, so the surface stays fresh instead of trapping warmth โ€” and it is laboratory-proven 30ร— more breathable than standard memory foam.

  3. Memory foam that moulds to you (Vascoยฎ60)

    High-grade memory foam that moulds to your shape for genuine pressure relief, soaking up movement so a partner shifting position won't disturb you.

  4. Layer that blends the foam into the springs

    It blends the soft upper foams into the springs underneath, so there is no abrupt change in feel as you settle. Included in the Firm and Hard builds.

  5. Tufted construction

    Locks every layer to the spring unit and sets the tension. The Medium is half-tufted, so the sleeping surface stays smooth; the Firm and Hard are fully tufted, drawing the buttons right through for the traditional dimpled surface.

  6. Two thousand pocket springs

    Two thousand separately pocketed springs, each reacting on its own to flex under you and your partner independently โ€” supportive, quick to respond, and airy in a way a solid foam core never manages.

  7. A firm edge you can sit on

    A reinforced border that resists collapse at the sides, letting you use every inch of the surface and perch or sleep right up to the edge.

The Medium is the softer, more cushioned build โ€” half-tufted, which sets a gentler tension while keeping the surface smooth. The Firm and Hard are fully tufted, giving the traditional dimpled surface and firmer support.

Why Choose Imperial Eliteโ„ข 2000?

Most made-to-measure mattresses are foam all the way through. This one isn't: two thousand individually pocketed springs form its core, the same thing you'd find in a good bed at home, giving the springy, breathable, "real bed" feel foam simply can't reproduce. Sitting over that spring core, memory foam shapes to you while a cool-gel layer keeps the surface fresh, all wrapped in a soft cashmere-blend cover.

Since each spring works independently, the support adapts to your body and any movement stays on your own half โ€” a real plus for couples. The reinforced edge keeps it firm and true for the long haul. Whatever the shape or size of your bed, this bespoke build brings the feel of a proper bedroom mattress to it.

Ideal for:

  • Anyone who wants an unusually shaped or oversized bed to sleep like a proper bedroom mattress
  • Couples โ€” self-contained springs stop movement travelling across the bed
  • Sleepers who favour the airy, springy response of pocket springs over all-foam
  • Anyone who needs a firm edge to sit on and push up from

Firmness Options

Medium

Soft, enveloping comfort finished with cashmere softness at the surface

Firm

More support underneath, still cushioned on top

Hard

Our most solid, most supportive specification

Every firmness is built to a 25 cm depth.

Care & Maintenance

Mattress

  • Single-sided design โ€” the labelled face is the one to sleep on, no flipping needed
  • The spring system looks after itself โ€” no upkeep required
  • The reinforced border holds its firmness for the long term

Cashmere-Blend Cover

  • Lift small marks with a little mild detergent on a cloth
  • Retains its smooth surface as the years pass
  • Hypoallergenic by nature

Measuring Guide

Every custom-size order is cut precisely to the measurements you send us; once the cover goes on, the finished mattress ends up a touch larger.

Where the mattress drops into a snug recess, or you want space to tuck sheets around it, it's worth trimming your figures slightly โ€” though that's entirely down to you.

Delivery

  • Free delivery across mainland Britain โ€” England, Scotland and Wales
  • Rolled & Boxed: vacuum-compressed into a 158 ร— 60 ร— 60 cm carton

Frequently Asked Questions

Why is this your flagship model?
It's the only bespoke hybrid we build around pocket springs โ€” 2000 of them, paired with memory foam, a cool-gel layer and a cashmere-blend cover across a multi-layer design. No other model in our range sleeps like it.
What do 2000 pocket springs actually do for comfort?
Because the springs act on their own, support follows your body closely and movement stays put rather than carrying across โ€” couples feel the difference most.
How does the cashmere-blend cover feel?
Silky, naturally gentle and hypoallergenic. On the Medium the stitching is half-tufted for a smooth finish; on the Firm and Hard it's fully tufted, with the traditional dimpled surface โ€” and it keeps looking and feeling good for years.
Once unrolled, how quickly is it ready?
Typically 95% of its custom shape and size returns within the first hour or two; now and then it may take 24 hours or so to regain its shape completely.
What comes in the box?
The mattress with its cashmere-blend cover, care instructions, and a 10-year guarantee.
Is anything you make more supportive?
No โ€” nothing we build is firmer or more supportive than the 2000 pocket spring system. Got particular needs? Get in touch and we'll point you to the right choice.
10-Year Guarantee Quality assured โ€” crafted in Britain to last

Would you rather talk it through with someone? Ring 0121 663 6114 โ€” Monโ€“Fri 10โ€“5, Sat 10โ€“2.