✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 3

SKU:GrandS131

Grand Crescent™ Left S Curve Luxury Bespoke Mattress - Single

Regular price £599.00
Regular price Sale price £599.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit →

Quick measuring reference

Place your order and send your measurements afterwards — email us at hello@mybespokemattress.com or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit — craft paper, marker and a prepaid return envelope. Trace your shape and post it back — we'll do the rest.

Sent once your mattress order is placed · Completely free · Posted out promptly

Quantity
Free UK delivery
England, Scotland & Wales
Made to your size
Cut to your measurements
Handmade in Britain
Made to order, by hand
Guaranteed quality
Up to 10-year guarantee
View full details
Grand Crescent Custom Mattress lifestyle Lifestyle

Four Layer Construction

Plenty of memory foam to cradle your hips and shoulders, and a breathable layer inside the cover so the bed never feels warm or clammy.

Grand Crescent four-layer construction diagram
  1. Cover that draws the heat away (Revo™)

    The internet calls it cool gel, but there is no gel in it — it is a foam made with open cells, so it releases your body heat rather than holding it in. Here that foam is built into the cover itself, sandwiched between two layers of fabric, sewn at the edges and finished with wave quilting, so cover and cooling are a single thing and it is the first thing you lie on. Laboratory-proven 30× more breathable than standard memory foam, so warmth never gathers below you. It is a cover very few makers have the skill to produce. Unzip it and the breathable layer comes away with it, making care simple.

  2. Deep memory foam that moulds to you (Vasco™60)

    Warmed by your body, it gently gives and cradles your shoulders, hips and back, taking the weight off the places that ache. It also absorbs movement, so if one of you gets up in the night, the other sleeps on.

  3. Springy support layer that stops you sinking (Laytec™)

    Set below the deep memory foam, a springy layer bears the load and keeps your back in line, so you settle into the cushioning on top while still being held from beneath.

  4. Firm base layer

    A firm, durable and airy foundation that keeps the mattress true to shape season after season, while staying light enough to move easily even where access is tight.

A hand was held on each foam, then lifted off. These are heat pictures of what it left behind — red is warm, blue is cool.

Heat picture of our Revo foam the moment a hand is lifted off it: a bright warm hand shape
Our Revo™ foam, hand just lifted
The same Revo foam one minute later: the warm hand shape has faded away
Our Revo™ foam, one minute later
Heat picture of a leading memory foam the moment a hand is lifted off it: a bright warm hand shape
A leading memory foam, hand just lifted
The same memory foam one minute later: still glowing red, still holding the heat
A leading memory foam, one minute later

A minute on, the memory foam is still holding the heat. Ours has let it go. That is what we mean when we say it sleeps cooler. Heat pictures by The Vita Group, who make the foam for us.

Why Choose Grand Crescent?

Grand Crescent mattress with its deep memory foam top layer

Memory foam cradles you better than anything else we make, but it usually holds onto heat, and that is why people give up on it. The Grand Crescent™ is our answer. Deep layers of it take the weight off your hips and shoulders: you settle right into it and it supports every pressure point, while a responsive layer below keeps you firmly held. And with that breathable foam sealed into the cover, that comfort arrives without the warmth memory foam usually traps.

This is the mattress for anyone who wants their bed to be the centrepiece of the room: made to your measurements in four bonded layers, in our two deepest builds, with the foam covered by an 8-year guarantee.

Ideal for:

  • Anyone who adores the embrace of memory foam yet overheats on it
  • Those after deep pressure relief with solid support beneath them
  • Couples — the memory foam draws in movement, so you're disturbed less
  • Anyone who wants our deepest, softest all-foam bed

Firmness & Depth Options

Firmness Levels

Medium

A gentler, enveloping feel with cooling woven in

Firm

A firmer base that still sleeps cool

Available Depths

20 cm

Deep enough for the full cradle, without overwhelming the bed frame

25 cm

The deepest we make — closest to a proper bedroom mattress

Both depths come in Medium or Firm. Carrying a little more weight? Get in touch and we'll help you settle on the ideal depth and firmness.

Care & Maintenance

Mattress

  • Single-sided build — sleep on the marked face only, no flipping
  • Let it breathe often to keep it feeling fresh

Zip-off cover

  • Dry clean only — don't put it in the machine
  • Never machine wash or hand wash it
  • Keep bleach and harsh chemicals away
  • Never put it through a tumble dryer

Measuring Guide

The Grand Crescent™ is bespoke to your room: your foam is made precisely to the custom size you send us, and once the cover is fitted it adds a few millimetres to the final dimensions.

Where the bed drops into a snug recess, or you like a little slack for tucking sheets in, it can help to trim your figures slightly — though that is entirely down to how you prefer it.

Delivery

  • Free delivery across the majority of mainland England, Scotland and Wales
  • Vacuum-rolled into a compact 158 × 39 × 39 cm carton that's simple to carry

Need the weight of a mattress? Just ask and we'll let you know.

Frequently Asked Questions

How do the memory foam and cooling work together?
The memory foam wraps around you and eases pressure, while the breathable cover carries heat away — giving you all the comfort of memory foam without the warmth it normally holds in.
What do the four layers do?
From the top: a breathable cover that carries heat away, deep memory foam that eases pressure, a responsive layer beneath it that rebounds and keeps your spine in line, then a firm, ventilated base that stops you sinking.
How long does a rolled mattress take to expand?
Typically 95% of its custom shape and size returns within the first hour or two; now and then it may take 24 hours or so to regain its shape completely.
What's included?
You receive the mattress with its zip-off cooling cover, a care guide and an 8-year guarantee on the foam.
Is the Firm option suitable for everyday use?
Yes. Firm here describes the support beneath you, not the surface. The memory foam above still moulds to your shape, which is what makes it fine night after night.
8-Year Guarantee Crafted in Britain and backed with total confidence

Would you rather talk it through with someone? Ring 0121 663 6114 — Mon–Fri 10–5, Sat 10–2.