10,000+ Mattresses Made Made to Your Exact Shape Free UK Delivery ★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:CoolpS109

Coolplus Right S Curve Bespoke Mattress - Single

Regular price ยฃ469.00
Regular price Sale price ยฃ469.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit โ†’

Quick measuring reference

Place your order and send your measurements afterwards โ€” email us at hello@mybespokemattress.com or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit โ€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back โ€” we'll do the rest.

Sent once your mattress order is placed ยท Completely free ยท Posted out promptly

Quantity
Free UK delivery
England, Scotland & Wales
Made to your exact size
Cut to your measurements
Handmade in Britain
In our workshop since 1985
Guaranteed quality
Up to 10-year guarantee
View full details
Coolplus Custom Mattress lifestyle Triple Layer Construction
Coolplus construction cutaway Lifestyle

Stay cool even in a warm, poorly ventilated room โ€” a foam that lets heat escape rather than store it, laboratory-proven 30ร— more breathable than standard memory foam (Revoยฎ).

  • 3 firmness levels: Medium, Firm, Hard
  • Depths from 15โ€“25 cm
  • 7-year guarantee
  • Moisture-wicking zip-off cover (Coolplusยฎ)
  • A top layer that doesn't hold your heat (Revoยฎ)
  • A springy layer that pushes back as you move (Laytecโ„ข)
  • Bonded 3-layer construction โ€” not one slab of foam
  • Light to lift and reposition on any bed base

Triple Layer Construction

Coolplus triple-layer construction diagram
  1. Moisture-wicking zip-off cover (Coolplusยฎ)

    Pulls heat and moisture away from you across the night for a drier, cooler surface. The whole cover unzips in moments and drops straight into the wash โ€” no need to haul the mattress anywhere to freshen it up.

  2. Top layer that draws the heat away (Revoยฎ)

    The internet calls this a cool gel foam. There is no gel in it โ€” the foam is made with open cells, so it releases your body heat rather than holding it in. Laboratory-proven 30ร— more breathable than standard memory foam, so warmth never gathers underneath you on a close, muggy night.

  3. Springy middle layer that stops you sinking

    Rebounds the instant you shift position, so you're never left feeling stuck in a hollow. It carries your spine evenly no matter how you lie.

  4. Firm base layer

    A firm, durable foundation that keeps the mattress true to shape season after season โ€” while staying light enough to manoeuvre easily even where access is awkward.

Why Choose Coolplus?

Snug bedrooms, attic rooms and small box rooms can become heat traps, and on a warm night a conventional foam mattress simply hangs onto that warmth. The Coolplus tackles the problem head-on, built to a bespoke custom size for whatever bed you're dressing. Its cool gel top layer channels heat away rather than storing it, while the responsive layer below rebounds fast to keep you aligned and well supported. What you get is genuinely cool, settled sleep with none of that sunk-in, hard-to-move sensation.

Ideal for:

  • Anyone in a warm, stuffy room where the air barely moves at night
  • Naturally hot sleepers who overheat on everyday foam
  • Those put off by the slow, sinking sensation of classic memory foam
  • Anyone who wants firm support without giving up the cooling

Firmness & Depth Options

Firmness Levels

Medium

An even feel underpinned by quick, springy support

Firm

Reinforced backing for the spine and joints

Hard

The firmest, most solid feel for anyone who sleeps best on a rigid bed

Available Depths

15 cm

Slimline comfort where clearance is limited or the base sits shallow

20 cm

An all-round depth that works beautifully for most made-to-measure beds

25 cm

Our deepest, most supportive build for a proper full-size bedroom feel

Every depth comes in Medium, Firm and Hard.

Care & Maintenance

Mattress

  • Single-sided build โ€” sleep on the marked face only, no flipping
  • Let it breathe often to keep it feeling fresh
  • Naturally unwelcoming to dust mites

Zip-off cover

  • Cool 30ยฐC machine wash on a gentle setting
  • A mild liquid detergent only โ€” never bleach
  • Dry naturally in the air
  • A low iron if it needs one
  • Freshen it every one to two months

Measuring Guide

Because each Coolplus is a bespoke, custom-size build, your foam is cut precisely to the measurements you send us; once the cover is fitted, it adds a few millimetres to the final dimensions.

Where the bed drops into a snug recess, or you like a little slack for tucking sheets in, it can help to trim your figures slightly โ€” though that is entirely down to how you prefer it.

Delivery

  • Free delivery across the majority of mainland England, Scotland and Wales
  • Vacuum-rolled into a compact 158 ร— 39 ร— 39 cm carton that's simple to carry

Need the exact weight of a mattress? Just ask and we'll let you know.

Frequently Asked Questions

How do the cool gel and responsive layers work together?
The responsive layer supplies the spring-back while the cool gel layer handles the cooling โ€” between them you get solid support without the warmth that ordinary memory foam holds in.
What does 30ร— breathability actually mean?
In lab conditions the cool gel layer moved air 30 times more freely than conventional memory foam, which is what stops heat and damp from gathering.
How long does a rolled mattress take to expand?
Typically 95% of its custom shape and size returns within the first hour or two; now and then it may take 24 hours or so to regain its shape completely.
What's included?
You receive the mattress with its Coolplus zip-off cover, a care guide and a 7-year guarantee.
Is the Firm option suitable for everyday use?
Yes. Think of it as a firm base with a soft, cooling surface over the top. You feel the support underneath rather than a hard slab against you.
7-Year Guarantee Crafted in Britain and backed with total confidence

Would you rather talk it through with someone? Ring 0121 663 6114 โ€” Monโ€“Fri 10โ€“5, Sat 10โ€“2.