✓10,000+ Mattresses Made ✓Cover included, never bare foam ✓Free UK Delivery ✓★★★★★Excellent
Size & Shape
Mattress
3
Order
Skip to product information
1 of 4

SKU:BodySK105

Bodyshape Left S Curve Bespoke Mattress - Super King

Regular price Β£509.00
Regular price Sale price Β£509.00
Sale Sold out
Choose Mattress Thickness
Choose Mattress Firmness
Measurements

Enter your measurements below then click Save Measurements

How to measure & fit β†’

Quick measuring reference

Place your order and send your measurements afterwards β€” email us at hello@mybespokemattress.com or WhatsApp us on 07769 431 970 with your order number and we'll take care of the rest.

We'll send you a free tracing kit β€” craft paper, marker and a prepaid return envelope. Trace your shape and post it back β€” we'll do the rest.

Sent once your mattress order is placed Β· Completely free Β· Posted out promptly

Quantity
Free UK delivery
England, Scotland & Wales
Made to your exact size
Cut to your measurements
Handmade in Britain
In our workshop since 1985
Guaranteed quality
Up to 10-year guarantee
View full details
Bodyshapeβ„’ construction cutaway Triple Layer Construction
Bodyshapeβ„’ Custom Mattress lifestyle Lifestyle

Memory foam that softens to your shape and cushions your hips and shoulders (Vascoβ„’). It soaks up movement too, so when one of you gets up in the night the other stays asleep.

  • 3 firmness levels: Medium, Firm, Hard
  • Depths from 15–25 cm
  • 5-year guarantee
  • Moisture-wicking zip-off cover (TENCELβ„’)
  • Memory foam top layer that moulds to you (Vascoβ„’)
  • Bonded 3-layer construction — each layer doing a different job
  • Light to lift and reposition on any bed base
  • When one of you gets up, the other stays asleep

Triple Layer Construction

Bodyshapeβ„’ triple-layer construction diagram
  1. Moisture-wicking zip-off cover (TENCELβ„’)

    Wicks moisture away as you sleep so the surface stays dry and fresh. The whole cover unzips in moments and drops straight into the wash β€” no need to haul the mattress anywhere to freshen it up.

  2. Memory foam top layer that moulds to you (Vascoβ„’)

    Warms to your body and shapes itself around your shoulders, hips and lower back, lifting the pressure that a hard, unforgiving bed base tends to create.

  3. Support layer that stops you sinking too far

    Works below the memory foam to hold your spine in a natural line and prevent you from sinking too deep. It quietly dampens movement too, so when one person shifts, the other sleeps on undisturbed.

  4. Firm base layer

    A firm, durable foundation that keeps the mattress true to shape season after season β€” while staying light enough to manoeuvre easily even where access is awkward.

Premium grade foams only. From 39 kg/m³ up to 70. Anything less does not make it into one of our mattresses.

Why Choose Bodyshapeβ„’?

An awkwardly shaped or built-in bed often forces you onto a thin, budget foam pad that offers little give β€” and the pressure points show up the moment you lie down. The Bodyshapeβ„’ is our bespoke answer, made to a custom size that fits your frame. A generous top layer of Vascoβ„’ memory foam cradles your shoulders and hips, while the support layer underneath keeps your back aligned and calms movement across the surface.

That movement control counts for even more on a narrower or two-person bed: when you lie close together, the Bodyshapeβ„’ soaks up a partner rolling over or slipping out during the night, so your own sleep carries on undisturbed.

Ideal for:

  • Couples sharing a snug bed who would rather not feel each other move
  • Anyone waking stiff and sore after nights on a hard, thin surface
  • Side sleepers who want foam that cushions and follows their contours
  • Anyone who wants firm support underneath without losing the cushioning on top

Firmness & Depth Options

Firmness Levels

Medium

A yielding, cradling surface with support kept in balance

Firm

Reinforced backing for the spine and joints

Hard

The firmest, most solid feel for anyone who sleeps best on a rigid bed

Available Depths

15 cm

Slimline comfort where clearance is limited or the base sits shallow

20 cm

An all-round depth that works beautifully for most made-to-measure beds

25 cm

Our deepest, most enveloping option for a proper full-size bedroom feel

Every depth comes in Medium, Firm and Hard. Carrying a little more weight? Get in touch and we'll help you settle on the ideal depth and firmness.

Care & Maintenance

Mattress

  • Single-sided build β€” sleep on the marked face only, no flipping
  • Let it breathe often, and pair it with a mattress protector
  • The foam layers need no upkeep of any kind

Zip-off cover

  • Cool 30Β°C machine wash on a gentle setting
  • A mild liquid detergent only β€” never bleach
  • Dry naturally in the air
  • A low iron if it needs one
  • Freshen it every one to two months

Measuring Guide

Every Bodyshapeβ„’ is made to measure: your foam is made precisely to the dimensions you send us, and once the cover is fitted it adds a few millimetres to the final size.

Where the bed drops into a snug recess, or you like a little slack for tucking sheets in, it can help to trim your figures slightly β€” though that is entirely down to how you prefer it.

Delivery

  • Free delivery across the majority of mainland England, Scotland and Wales
  • Vacuum-rolled into a compact 158 Γ— 39 Γ— 39 cm carton that's simple to carry

Need the weight of a mattress? Just ask and we'll let you know.

Frequently Asked Questions

How does Vascoβ„’ memory foam work?
Your body heat softens it so it takes on your shape, distributing your weight across the surface and relieving strain at the shoulders, hips and back.
How good is the motion isolation?
Very good β€” Vascoβ„’ foam swallows movement instead of carrying it across the surface, so a partner rolling over or getting up leaves you undisturbed.
How long does a rolled mattress take to expand?
Typically 95% of its custom shape and size returns within the first hour or two; now and then it may take 24 hours or so to regain its shape completely.
What's included?
You receive the mattress fitted with its TENCELβ„’ zip-off cover, a care guide and a 5-year guarantee.
Is the Firm option suitable for everyday use?
Yes. Plenty of people have Firm as their main bed at home. The support sits underneath you; the memory foam on top still gives, so it holds you up without feeling hard.
5-Year Guarantee Crafted in Britain and backed with total confidence

Would you rather talk it through with someone? Ring 0121 663 6114 β€” Mon–Fri 10–5, Sat 10–2.